ABOUT THE PROJECT

Opposite Marina Borik, a new luxury settlement “Marina Project Zadar” is under construction with apartments ranging in size from 50 m2 to 220 m2.

The project consists of three construction phases, the first of which is currently under construction, and consists of three residential buildings: V8, V3 and V2.

Each building is designed with an underground garage from which you can reach the apartments with an elevator, which are located on the ground, first, second and third floors with roof terraces that belong to the apartments on the third floor.

The construction of the second phase started in  april 2022., and consists of 5 new buildings.

The completion of the construction of buildings A and C is planned for the summer of 2023, and building B at the end of 2023.

Buildings D and E are planned to be completed in the summer of 2024.

The beginning of the construction of the third phase is planned for the beginning of 2024.

In addition to an attractive location, high-quality equipment and large terraces complete the offer, which ensures a high quality of life and an increase in the value of real estate.